Mechanical Engineering

About Department

Mechanical Engineering, the branch of engineering concerned with the design, manufacture, installation, and operation of engines and machines and with manufacturing processes. It is particularly concerned with forces and motion.

The invention of the steam engine in the latter part of the 18th century, providing a key source of power for the Industrial Revolution, gave an enormous impetus to the development of machinery of all types. As a result, a new major classification of engineering dealing with tools and machines developed.

Mechanical engineering has evolved from the practice by the mechanic of an art based largely on trial and error to the application by the professional engineer of the scientific method in research, design, and production.

Duration 3 YEAR
ELIGIBILITY: 10th
INTAKE: 90
apply now
VISION
"To be a premier center for producing competent Mechanical Engineers to cater the ever-changing industrial demands and societal needs."
MISSION
→ To provide better environment to the students and faculty members, creating an ambience conducive for excellence in Mechanical Engineering education.
→ To strengthen industry institute interaction to made the challenges of industry and society.
→ To impart quality technical education to inculcate moral values, professional ethics and entrepreneurial qualities.
Sr. No Name of the Laboratory List of Software
1 POWER ENGINEERING LAB. SOLAR WATER HEATING SYSTEM, CUT SECTION OF FLOW CONTROL VALVE, CUT SECTION OF DIRECTION CONTROL VALVE, CUT SECTION OF SAFETY VALVE, CUT SECTION OF PRESSURE CONTROL VALVE, OIL HYDRAULIC TRAINER, PNEUMATIC CIRCUIT TRAINER
2 IC ENGINE LAB 2 STAGE 2 CYLINDER AIR COMPRESSOR TEST RIG, SINGLE CYLINDER 4 STROKE 5 HP DIESEL ENGINE TEST RIG, IGNITION SYSTEM OF MARUTI CAR ENGINE CUT SECTION, COOLING AND LUBRICATION SYSTEM OF MARUTI CAR ENGINE CUT SECTION, MULTI CYLINDER PETROL ENGINE TEST RIG, MODELS OF CARBURATOR, SECTIONAL WORKING MODEL OF PETROL/DIESEL ENGINE
3 THERMAL AND POWER ENGINEERING LAB CRITICAL HEAT FLUX APPARATUS, DROP AND FILM CONDENSATION APPARATUS, EMISSIVITY MEASUREMENT APPARATUS, PIN FIN APPARATUS, STEFAN BOLTZMAN APPARATUS, METAL BAR APPARATUS, INSULATING POWDER APPARATUS
4 WORKSHOP LATHE MACHINE, SHAPER MACHINE, POWER HACK SAW MACHINE, WOOD WORKING LATHE MACHINE, WELDING MACHINE, MILLING MACHINE
5 METROLOGY AND MEASUREMENT LAB MONOCULAR METALLURGICAL MICROSCOPE, METALLURGICAL SPECIMEN, FRACTURE SPECIMEN, COLD MOULDING DIE, COLD MOULDING LIQUIDAND RAISING, VARIOUS CRYSTAL MODEL
6 REFRIGERATION AND AIR CONDITIONING AIR CONDITIONING TEST RIG, COMPRESSOR, DOMESTIC REFRIGERATOR, DESERT COOLER TEST RIG, REFRIGERATION TEST RIG, WINDOW AIR CONDITIONING,
7 MECHATRONICS LAB PROGRAMMABLE LOGIC CONTROLLER TRAINER WITH DEMONSTRATION, PLC REAL TIME APPLICATION TRAINER
8 CNC AND ROBOTICS LABORATORY CNC TURNING, VMC, ROBOT PICK AND PLACE, COMPRESSOR
9 DRONE LAB Drone Kit, Transmitter & Receiver (Remote), ESC, MOTOR, Propeller, Frame, Flight controller board, GPS compass, Battery Lipo 4000mah, Charger for battery, Anti-Vibration shock absorber,
10 AUTOMOBILE LAB single plate Coil Clutch, Diapraghm Clutch, Synchromesh Gear Box, Differential, Steering System, Drum Break, Leaf Spring Suspension, Exhaust Gas Analyzer,
11 ENGINEERING METALLURGY Monocular Metallurgical Microscope, Metallographic Speciman, Facture Specimen, Disk Pollishing Machine
12 CAD LAB AUTOCAD
Sr. No Event COLLABORATION
1 Expert Lecture Basics of AutoCAD and Advance Modelling Tool - Autodesk Fusion 360
2 Expert Lecture Industrial Automation
3 Industrial Visit Ador Imfotech Pvt.Ltd.Nagpur
4 Industrial Visit Parale-G Pvt. Ltd. Nagpur
5 Industrial Visit Narrow Gauge Rail Museum, Nagpur
6 NSS Road Safety Awareness Program
7 NSS Celebration of National Youth Day
Sr. No Semester View
1 1st Semester - K Scheme
2 2nd Semester - K Scheme
Criteria-1 Criteria-2 Criteria-3 Criteria-4 Criteria-5 Criteria-6 Criteria-7 Criteria-8 Criteria-9 Criteria-10

Criteria 1.3

Criteria 1.4

Criteria 2.1.1.A(a)

Criteria 2.1.1.A(b)

Criteria 2.1.1.B

Criteria 2.1.1.B.(a)

Criteria 2.1.2.B(a)

Criteria 2.1.2.B(b)

Criteria 2.1.2.B(c)

Criteria 2.2.1.A(a)

Criteria 2.2.1.A(b)

Criteria 2.2.1.A(c)

Criteria 2.2.1.B(a)

Criteria 2.2.1.B(b)

Criteria 2.2.1.C(a)

Criteria 2.2.1.C(b)

Criteria 2.2.1.C(c)

Criteria 2.2.1.C(d)

Criteria 2.2.1.C(e)

Criteria 2.2.1.D

Criteria 2.2.1.E

Criteria 2.2.1.F(a)

Criteria 2.2.1.F(b)

Criteria 2.2.1.F(c)

Criteria 2.2.1.F(d)

Criteria 2.2.1G(a)

Criteria 2.2.1G(b)

Criteria 2.2.1G(c)

Criteria 2.2.1G(d)

Criteria 2.2.2.A

Criteria 2.2.2.B(a)

Criteria 2.2.2.B(b)

Criteria 2.2.2.C(a)

Criteria 2.2.3.A(a)

Criteria 2.2.3.A(b)

Criteria 2.2.3.B(a)

Criteria 2.2.3.B(b)

Criteria 2.2.3C

Criteria 2.2.4A

Criteria 2.2.4C(a)

Criteria 2.2.4C(b)

Criteria 2.2.4E(a)

Criteria 2.2.4E(b)

Criteria 2.2.4F(a)

Criteria 2.2.4F(b)

Criteria 2.2.5B

Criteria 2.2.5C

Criteria 2.2.5D

Criteria 2.2.5E(a)

Criteria 2.2.5E(b)

Criteria 2.2.5F

Criteria 2.2.6B

Criteria 2.2.7B

Criteria 2.2.8

Criteria 3.2.1(a)

Criteria 3.2.1(b)

Criteria 3.2.1(c)

Criteria 3.2.1(d)

Criteria 3.3.1(a)

Criteria 3.3.1(b)

Criteria 3.3.1(c)

Criteria 3.3.1(d)

Criteria 4.7.1B(a)

Criteria 4.7.1B(b)

Criteria 4.7.2(a)

Criteria 4.7.2(b)

Criteria 4.7.3(a)

Criteria 4.7.3(b)

Criteria 5.a(1)

Criteria 5.a(2)

Criteria 5.a(3)

Criteria 5.4.a(4)

Criteria 5.5A

Criteria 5.6.B(a)

Criteria 5.6.B(b)

Criteria 5.6.B(c)

Criteria 5.6.B(d)

Criteria 6.1_(a)

Criteria 6.2_(a)

Criteria 6.2_(b)

Criteria 6.3_(a)

Criteria 6.4_(a)

Criteria 6.6

Criteria 8.1(a)

Criteria 8.1(b)

Criteria 8.1(c)

Criteria 8.1(d)

Criteria 8.2-A(a)

Criteria 8.2-A(b)

Criteria 8.2-A(c)

Criteria 8.2-A(d)

Criteria 8.2-B

Criteria 8.3(a)

Criteria 8.3(b)

Criteria 8.4-A

Criteria 8.5A(a)

Criteria 8.5-A(b)

Criteria 8.5A-(c)

Criteria 9.1.1

Criteria 9.1.2

Criteria 9.4_(a)

Criteria 9.4_(b)

Criteria 9.4_(c)

Criteria 9.4_(d)

Criteria 9.4_(e)

Criteria 9.4_(f)

Criteria 9.4_(g)

Criteria 9.4_(h)

Criteria 9.4_(i)

Criteria 9.4_(j)

Criteria 9.4_(k)

Criteria 9.4_(l)

Criteria 9.4_(m)

Criteria 9.4_(n)

Criteria 9.4_(o)

Criteria 9.4_(p)

Criteria 9.4_(q)

Criteria 9.4_(r)

Criteria 9.5_(a)

Criteria 9.5_(b)

Criteria 9.5_(c)

Criteria 9.5_(d)

Criteria 9.5_(e)

Criteria 9.5_(f)

Criteria 9.6